Contact for press

You can contact us by:

Rocio Castro. Communication Department.

Media Kit

Follow us on:

Keep up-to-date on the latest at the Abengoa website:

November

Abengoa signs a cooperation agreement with ACWA Power, ICBC and Shanghai Electric Group Co. for the development of energy projects

November 28, 2018 Descargar Download document (pdf 72 KB)

The signing took place in the presence of Chinese President Xi Jinping, in the framework of his official visit to Spain, and the President of the Spanish Government Pedro Sánchez. The objective of the...

Abengoa announces the satisfaction of conditions precedent for the agreed sale of 16.47% of Atlantica Yield to Algonquin Power & Utilities Corp

November 22, 2018 Descargar Download document (pdf 78 KB)

Abengoa continues to fulfil its disinvestment commitments by selling its total stake in Atlantica Yield (AY). The Canadian company gets a 41.47% of the capital of AY. The operation has a value of 345 ...

Abengoa, selected to develop the engineering, procurement and construction of seven electrical substations for the second phase of the Quebrada Blanca mine in Chile

November 19, 2018 Descargar Download document (pdf 146 KB)

The value of the project is approximately US$ 54 million.

Opened the Antel Arena of Montevideo, built by Abengoa

November 15, 2018 Descargar Download document (pdf 71 KB)

It is a multifunctional complex of 40,500 m2 with a capacity for 10,000 seated spectators. Abengoa was responsible for the construction of the project, whose execution has been carried out...

Abengoa, Celebrating 50 years of activity in Argentina

November 13, 2018 Descargar Download document (pdf 148 KB)

Established in 1968, the Argentine subsidiary of Abengoa, Teyma Abengoa has developed projects in the energy, telecommunications, industrial, sanitation and environmental sectors. In the last 50 years...

Abengoa announces Q3 2018 results

November 12, 2018 Descargar Download document (pdf 171 KB)

Improvements of Health and Safety indicators with a Lost Time Injury Rate (LTIR)(1) of 2.8 (5.1 in Q3 2017).

Abengoa Peru restructures its debt

November 9, 2018 Descargar Download document (pdf 136 KB)

Abengoa Peru restructures its debt



© 2019 Abengoa. All rights reserved