You can contact us by:
Rocio Castro. Communication Department.
December 26, 2017
Download document (pdf 82 KB)
The project includes the design, construction, commissioning and operating of the plant during a period of three months. The plant will produce 50,000 cubic meters of desalinated water each day, and w...
December 18, 2017
Download document (pdf 65 KB)
The contract is valued at €37.5 million. The company will be responsible for the sectioning of a 345 kV high voltage line and the construction of a new electrical substation in the southern part of th...
December 14, 2017
Download document (pdf 142 KB)
The company will be responsible, on behalf of Alstom Argentina S.A., for assembly and installation works and/or necessary renovation works to be carried out on the Electrical Supply system on the B Li...
December 12, 2017
Download document (pdf 144 KB)
This is an alliance of Spanish companies that aims to become a world benchmark for rail innovation as well as a meeting point for needs and rail knowhow at international level. The initiative is pr...
December 11, 2017
Download document (pdf 140 KB)
The Consortium will be responsible for the engineering, procurement and construction of a 113,650 m3/day reverse osmosis desalination plant with sea water intake in Salalah, in the southern area of Dh...
December 11, 2017
Download document (pdf 89 KB)
The ZAS Project (Zinc-air secondary batteries based on innovative nanotechnology for efficient energy storage) aims to develop a rechargeable Zinc-Air battery that will broaden the application areas o...