You can contact us by:
Rocio Castro. Communication Department.
November 27, 2017
Download document (pdf 140 KB)
The company will be responsible for the electromechanical installation of a substation and the section of line for a wind farm that Aluar is to develop in the south of the country.
November 20, 2017
Download document (pdf 67 KB)
The facility has the capacity to desalinate 200,000 m3/day of sea water. It is the third desalination plant Abengoa has built in this country, and all three facilities enable more than 2.5 million p...
November 14, 2017
Download document (pdf 100 KB)
Improvements of Health and Safety indicators with a Lost Time Injury Rate (LTIR) of 5.1.
November 10, 2017
Download document (pdf 199 KB)
Funded by the European Union within the first call for the Interreg MED programme, the project aims to energize the introduction of Microgrids
November 8, 2017
Download document (pdf 68 KB)
Abengoa will undertake the work for Fulcrum BioEnergy after financial closure for the project was successfully reached.
November 1, 2017
Download document (pdf 193 KB)
• Total consideration for the transaction of 607 MUSD, which implies 24.25 USD per Atlantica Yield share.