You can contact us by:
Rocio Castro. Communication Department.
June 30, 2017
Download document (pdf 154 KB)
Abengoa Chairman, Gonzalo Urquijo, reiterated that reviving business where the company had been operating previously is one of the key company objectives.
June 29, 2017
Download document (pdf 143 KB)
It is the largest desalination plant designed for drinking water and irrigation.
June 19, 2017
Download document (pdf 142 KB)
The project is valued at 18 million euros and consolidates Abengoa’s role as a major player in the area.
June 12, 2017
Download document (pdf 143 KB)
The plant, which has been operational since 2014 and has an installed capacity of 42 MW and a 99.3% availability factor, was awarded by the Federal Electricity Commission. This is the third plant that...
June 5, 2017
Download document (pdf 143 KB)
Abengoa is leader in the electromechanical assembly market in Chile with more than 30 years of experience