Contact for press

You can contact us by:

Marián Ariza Communication Department.

Media Kit

Follow us on:

Keep up-to-date on the latest at the Abengoa website:

September

Abengoa completes $132.4 million loan guarantee financing for its first biomass ethanol plant in Hugoton, Kansas

September 30, 2011 Descargar Download document (pdf 17 KB)

Abengoa to develop three 64 MW wind farms for the National Electricity Agency in Brazil

September 30, 2011 Descargar Download document (pdf 17 KB)

The project will be carried out as a joint venture between Abengoa and Banco Santander Brazil. The energy produced will be sold to Brazil’s National Energy Agency (ANEEL).

The Focus-Abengoa Foundation presents the reopening of the “View Seville” exhibition adapted to new multimedia technologies

September 30, 2011 Descargar Download document (pdf 166 KB)

The exhibition includes multimedia screens that allow visitors to compare the panoramic engraving of Seville held by the Naval Museum in Madrid, with the painting “Vista de Sevilla” owned by the Focus...

The submissions period for the 3rd edition of the Alfonso E. Pérez Sánchez International Prize of the Focus-Abengoa Foundation is drawing to a close

September 29, 2011 Descargar Download document (pdf 64 KB)

All entries must be submitted on or before 30th September 2011. The Award is aimed at fostering scientific study and research geared towards contextualizing the paintings of Velázquez.

Abengoa completes India’s first solar-thermal power plant

September 26, 2011 Descargar Download document (pdf 36 KB)

The plant, developed for the Indian Institute of Technology in Mumbai, will be able to meet the energy demand from approximately one thousand homes. Located in Gwal Pahari in the state of Haryana, th...

Abengoa starts construction of the commercial scale biomass plant located in Hugoton, Kansas

September 20, 2011 Descargar Download document (pdf 37 KB)

Abengoa starts construction of the commercial scale biomass plant located in Hugoton, Kansas

The submissions period for the 3rd edition of the Alfonso E. Pérez Sánchez International Prize of the Focus-Abengoa Foundation is drawing to a close

September 20, 2011

All entries must be submitted on or before 30th September 2011. The Award is aimed at fostering scientific study and research geared towards contextualizing the paintings of Velázquez.

The submissions period for the 28th edition of the Focus-Abengoa Foundation International Painting Prize is drawing to a close

September 19, 2011 Descargar Download document (pdf 25 KB)

Applicants that wish to enter the competition must register their entries before Tuesday 20 September 2011. Entries must be sent by certified mail or delivered in person to the headquarters of the Fo...

Abengoa closes $1.2 billion financing for the Mojave Solar Project and starts construction

September 14, 2011 Descargar Download document (pdf 42 KB)

Loan proceeds will be used for the construction of the 280 MW (gross) Mojave Solar Project, utilizing advanced technology manufactured in America

First Abengoa and E.ON joint concentrating solar power plant comes online

September 8, 2011 Descargar Download document (pdf 113 KB)

Solar power for over 26,000 households. Sunlight concentrated by 60,500 mirrors over 110 hectares.



© 2019 Abengoa. All rights reserved