Transmission and distribution

Abengoa is a global benchmark in the construction of transmission and distribution infrastructures, with more than 27,000 km of transmission lines and more than 330 substations built in the last 15 years.

We carry out projects of medium, high and very high voltage and we have capacities to carry out integral projects, supply of materials, complete assembly, cable laying, OPGW and live-line working.

We build high and medium voltage electrical substations of any technology, from conventional AIS substations to GIS substations, as well as all the work related to them.

Main activities:

  • Electrical substations.
  • Transmission and distribution lines.
    • Alternating Current (AC).
    • Direct Current (DC).
    • Underground.
  • OHTL and SS engineering. 

 

Main references:

 ProjectKm OHTL/no. SSLocationScopeClientStatus

750 kV Zaporizhia - Kakhovska OHTL

187 km Ukraine

Engineering, construction and commissioning of 750 kV transmission line

Ukraine National Energy Company In operation since 2020

Engineering and construction of transmission lines and substations

More than 500 km & ten SS

France

Several framework contracts for engineering, construction and modifications

Réseau de transport d'électricité (RTE) In operation since 2003 to present day 

High voltage transmission lines and electrical substations

Since 2004, more than 600 km of TL, 2,000 km of OPGW & 35 SS Spain

Engineering, supply, construction and commissioning of HV and MV transmission lines and substations 

Main electricity, railway and industrial companies in Spain as well as private developers of renewable energy parks 

1945 - present day

400/220 kV Faya – Shamkha OHTL

23 km United Arab Emirates

Engineering, supply, construction and commissioning of 400/220 kV line, quadruplex system from Al Faya to the new 400/220 kV Shamkha Grid Station 

Abu Dhabi Transmission & Deepatch Company (TRANSCO) Completed in 2017

132kV Shagaya OHTL

37.5 km Kuwait

Engineering, supply, construction and commissioning of 132 kV double circuit Shagaya transmission line 

Kuwait Institute of Scientific Research (KISR) Completed in 2016

132/33 kV Al Dreez substation

One SS Oman

Engineering, supply, construction and commissioning of 132/33 kV 2x125 MVA GIS Substation and modification works in the distribution control center 

Oman Electricity Transmission Company (OETC) Completed in 2016

230 kV GIS substations in Jaco and Coyol

18.5 km & two SS Costa Rica

Engineering, supply, construction and commissioning of two 230/34.5/13.8 kV GIS substations and associated transmission lines

Instituto Costarricense de Electricidad (ICE) Completed in 2016

800 kV direct current Biswantha Chariyali – Agra line

400 km India

Engineering, supply, construction and commissioning of two sections of 200 km each at 800 kV direct current, two-pole with six conductors per pole 

Power Grid Completed in 2015

380 kV GIS substations in Riyadh and Jeddah

Two SS Saudi Arabia

Engineering, supply, construction and commissioning of two 380 kV GIS substations 

Saudi Electricity Company (SEC) Completed in 2014

Electric interconnection system among Central America (SIEPAC)

1,185 km

Central America (Guatemala, Panama, Costa Rica and Nicaragua)

Engineering, supply, construction and commissioning of the 230 kV transmission line

Empresas Propietarias de la Red (EPR) Completed in 2013

400 kV Wadialrabia – Rowies OHTL

500 km & two SS Libya

Engineering, supply, construction and commissioning of 400 kV transmission line, 500 km long and for 400 kV GIS substations

General Electricity Company of Libya (GECOL) Completed in 2013

Augmentation of 33 kV network in Western Region of Abu Dhabi

20 SS United Arab Emirates

Design, supply and installation of nine new 33/11kV substations. Augmentation of two existing 11 kV substations and dismantling and relocation of other nine substations

Abu Dhabi Distribution Company (ADDC) Completed in 2010


© 2019 Abengoa. All rights reserved