![]() |
Telvent will provide the engineering and will commission the two control centers that will serve as external back-up for the Main Control Center
The Tianjin Project, financed by FAD credits, includes the start-up of twenty-two stations covering a route of twenty-seven kilometers, which is planned to start functioning at the end of 2005
In the Integral Human Resource Policy category
This system is based on the TMS system (Telvent Metering System) which will enable the Port Authority to manage its energy services to its customers through a bidirectional, extendable communications infrastructure
This project is part of the coordination strategy for the IT security policy of the Andalusian Government
The Ajalvir Non-Hazardous Waste Center
The system will monitor, control and manage PECO's entire pipeline network of more than 6,600 miles (10,600 kilometres)
Ebitda reached 185,2 million euros, a 6% increase. Earnings before tax went from 23.7 to 64.5 M Euros. Earnings after-tax attributable to he parent company is 47 million euros, 8,1% increase