News
Quotes
Blog. Solutions for our world

Home >> Investors >> Press Room >> News Archive >> 2005 >> November

2005November

November

Telvent Announces Third Quarter 2005 Financial Results (30/11/2005)

Revenues Increase 37.6% to €100.0 Million Year-Over-Year.Pro Forma EPS of €0.18 Per Diluted Share

GE Energy Financial Services, growing internationally, forms power transmission line partnership with Abengoa Chile (30/11/2005)

GE Energy Financial Services, growing internationally, forms power transmission line partnership with Abengoa Chile

Her Royal Highness the Princess Elena to inaugurate the exhibition From Herrera to Velázquez. Early Naturalism in Seville, at the Hospital of Los Venerables (29/11/2005)

Over sixty pieces by Velázquez, Herrera the Elder, Caravaggio, Zurbarán, Ribera, Alonso Cano, etcetera, in one of the greatest exhibitions of Spanish painting in the international panorama. Seville welcomes masterpieces proceeding from institutions such as the Prado Museum, the National Gallery of London, the State Hermitage Museum of Saint Petersburg, the Museum of Berlin, and the Art Institute of Chicago, among others, as well as from individual collections

New Lines Contract for Abengoa, in Brazil (24/11/2005)

New Lines Contract for Abengoa, in Brazil

Abengoa Perú will construct its first Drinking Water Treatment Plant (24/11/2005)

Abengoa Perú will construct its first Drinking Water Treatment Plant

Befesa will perform the integral management of the industrial remainders of the centers of Cepsa by 20 million euros (22/11/2005)

The objective is to minimize the wastes generated in Cepsa’s different plants with the technological support provided by Befesa

Mahres Project:Renewable Hydrogen Map for Spain (18/11/2005)

The Mahres Project aims for the consideration of future scenarios where there would be a certain demand of hydrogen, and also for posing different methods for the production, and transportation, of such hydrogen, by means of renewable energy sources

Telvent Announces Third Quarter 2005 Earnings Conference Call (18/11/2005)

Telvent Announces Third Quarter 2005 Earnings Conference Call

Results for the third quarter of 2005 (16/11/2005)

Abengoa’s operating result increased 24.3 per cent in the third quarter and reached 152.7 million euro

Abengoa Bioenergía receives the Best European Business Award for Innovation (15/11/2005)

t was chosen from among all the Spanish companies as one with one the most successful Innovation Strategies

Abengoa Bioenergy closes the financing to construct its fourth ethanol plant in the United States (08/11/2005)

A 90 million dollar credit has been obtained in the USA financial market to finance the project

Notification of the Commencement of Operations of the Joint Venture (Brazil) (08/11/2005)

Commissioning of the Transmisora de Energía Joint Venture - the concessionaire for the 525 kV Londrina-Assis-Araraquara line

Telvent selected to supply ticketing systems for the Madrid and Bilbao Metros (04/11/2005)

Contracts to contribute to the needs of Bilbao and Madrid through the promotion of public transport systems in Spain

O2Diesel Reaches Agreement with Abengoa Bioenergy to jointly develop and demonstrate the European Market for its Cleaner Burning Ethanol Diesel Blend (03/11/2005)

Abengoa Bioenergy will make available to O2Diesel the opportunity to base its European operation at one of their facilities in Seville

«« Go to news archive